GAA Development at the Spawell

The Dublin GAA County Board have summitted development plans for their grounds at the Spawell.

The complete planning application and associated documentation can be viewed here:

https://planning.agileapplications.ie/southdublin/application-details/65124

The development will consist of a GAA Cluster Facility including:
a) 3 no. floodlit GAA pitches (Pitches No’s 1., 3. & 4.) comprising; Pitch no. 1, a sand-based grass pitch (145m x 90m) with floodlights with a lux level of 500 mounted on 7 no. 21.4m high columns;
Pitch no. 3, a sand-based grass pitch (140m x 90m) with floodlights with a lux level of 350 mounted on 6 no. 21.4m high columns;
Pitch no. 4, a synthetic all weather pitch (140m x 90m) with floodlights with a lux level of 350 mounted on 6 no. 21.4m high columns;
All pitches will have GAA goal posts and ball stop netting to rear of same, (90m x 16m in height to the eastern end of Pitch no. 1 and Pitch no. 4 and 30m x 16m in height elsewhere) electronic scoreboards and 2 dugouts each, a railing around the perimeter of each of the sand-based pitches and 2.4m sports fencing around the perimeter of the all-weather pitch.
b) The provision of floodlighting for Pitch no. 2, which is under construction (Ref. ED 19/0005) with floodlights with a lux level of 350 mounted on 6 no. 21.4m high columns); Three floodlight mountings serving Pitch no. 2 are on three shared columns also serving Pitch no. 3.
c) The construction of a single storey Pavilion building (2050 m2) to provide 10 no. team changing rooms, showers and toilets, male and female officials changing rooms, kitchen preparation and service area, dining / multi-purpose room, team meeting room, gymnasium / weights room, medical room, physio room, first aid room, storage, tuck shop, reception, cleaning supplies room, office, changing places room, male WC, female WC, unisex WC, foyer/ entrance lobby and plant room. The Pavilion building will include photovoltaic panels on the roof and associated heat pump enclosure.
d) the provision of a separate Indoor Training Facility including a 20m x 30m pitch. (600m2)
e) Maintenance garage (200 m2) adjoining Indoor Training Facility building.
f) the construction of a spectator stand to the south of Pitch no. 1 to accommodate 500 seated spectators with roof/cover, with Public Toilets (male and female) and equipment storage and plant located in undercroft of the stand.
g) a 500 person uncovered terraced spectator stand, on the south of Pitch no. 1 consisting of two separate 250 person terraces either side of the main spectator stand
h) Hurling wall, 5m in height and 105m in total length on two sides of an all weather hurling practice area / warm up area (40m x 65m) and also including 2.4m high fence and floodlights with a lux level of 300 mounted on 4 no. 18m high columns.
i) a sprint training area of synthetic all weather surface adjoining the hurling warm-up area.
j) Plaza area; space between Pitches no. 1, 3 & 4, and Pavilion Building with hard and soft landscaping including permeable paving areas.
k) a walking/jogging trail (1.32km) with outdoor exercise equipment within the perimeter of site,
l) a proposed new signalized junction roadway and pedestrian/ cyclist access onto Wellington Lane at its junction with Rossmore Road;
m) 112 car parking including 84 no. standard car parking spaces, 5 no. universal access spaces, 23 no. electric vehicle parking spaces with associated charging points and the provision of an additional 55 no. overflow spaces for intermittent use with a grasscrete finish, 4 no. coach spaces and bicycle stands for the parking of 161 no. bicycles.
n) demolition of the driving range bays (820 m2), at Spawell Golf Academy.
o) demolition of part of Indoor soccer pitch facility (296 m2 area to be demolished) at Spawell Leisure Centre.
p) removal of part of outdoor soccer pitch (326 m2 area to be removed) at Spawell Leisure Centre.
q) demolition of 1 no. maintenance shed (34 m2) at Spawell Leisure Centre.
r) SuDS Measures including a combination of stone-attenuation beds within pitches, tree pits, permeable overflow parking surface, permeable paving to plaza area, grassed swales and channels.
s) an ESB substation and 2 no. switch rooms, housed in one structure of overall area 57m2.
t) site clearance to include removal of trees and vegetation.
In addition, the development will include;
u) Earthworks, drainage infrastructure and attenuation, retaining structures, signage, landscaping, security fencing / boundary treatment, bin storage, and all other associated site development works above and below ground level.

19 Jul

Submission on proposed BusConnects Dublin – Templeogue / Rathfarnham to City Centre Core Bus Corridor Scheme

See attached submission to An Bord Pleanála on behalf of the WORK Residents’ Association in relation to the proposed BusConnects Dublin – Templeogue / Rathfarnham to City Centre Core Bus Corridor Scheme.

More information on this scheme can be found here:

https://busconnects.ie/12-core-bus-corridor-statutory-applications/templeogue-rathfarnham-to-city-centre-core-bus-corridor-scheme/

https://templeoguerathfarnhamscheme.ie/

An individual or group of individuals may submit their own observations either in hard copy or online AND the submission must be accompanied by the fee of €50.

Hard copy submissions/observations may be made in writing to:
An Bord Pleanála (Strategic Infrastructure Division),
64 Marlborough Street,
Dublin 1,
D01 V902
in relation to: TEMPLEOGUE / RATHFARNHAM TO CITY CENTRE CORE BUS CORRIDOR SCHEME

Online submissions can be made via the An Bord Pleanála website at the following address:

https://online.pleanala.ie/en-ie/sid/observation

Submissions must reach the said Board not later than 5:30pm on the extended date of 15th August 2023.